Skip to Main Content

Cornette Library Maintenance and Renovations

To share upcoming and past projects that maintain and improve the physical building.

What's Going On?

The Cornette Library decided to make some changes to the seminar rooms in the library. Over the 2021-2022 holiday break, we repainted the rooms and started to add some sound dampening measures to lessen the amount of noise traveling between the rooms and the silent areas of the library.  The first step was to add insulation in the drop ceilings and door sweeps to the bottom of the study room doors.  Over Spring Break 2022 we added 90 degree boots at the return air ducts in the drop down ceilings and sound absorbing acoustical tiles to the walls.  

Before Photos

Seminar B

Seminar B with the old tan paint and heavy wooden tables.

In-Progress Photos

Painting grey seminar B.

Starting the painting! The grey paint is called Bashful Emu.

Seminar B in progress.

Seminar B in progress. Painting the room changes it's whole demeanor!

Seminar B in progress.

Look how clean and calm the room feels!

Seminar B in progress.

Adding the whiteboard to the grey wall makes it pop!

Seminar B in progress.