The Cornette Library decided to make some changes to the seminar rooms in the library. Over the 2021-2022 holiday break, we repainted the rooms and started to add some sound dampening measures to lessen the amount of noise traveling between the rooms and the silent areas of the library. The first step was to add insulation in the drop ceilings and door sweeps to the bottom of the study room doors. Over Spring Break 2022 we added 90 degree boots at the return air ducts in the drop down ceilings and sound absorbing acoustical tiles to the walls.
Some before pictures of room 162.
Before picture of room 162.
A before photo.
A before photo.
In progress picture while painting the room.
An after photo of the study room with the new panels.
A before photo of room 163.
In progress while painting the room.
Almost done!
An after photo of the room 163.
Room 163 with the new panels on the wall.
A photo in progress while painting room 164.
Room 164 almost ready.
The room with the lights on!
An after photo of the room 164.
The new panels at the library - by Pippa's first floor.