The Cornette Library decided to make some changes to the seminar rooms in the library. Over the 2021-2022 holiday break, we repainted the rooms and started to add some sound dampening measures to lessen the amount of noise traveling between the rooms and the silent areas of the library.  The first step was to add insulation in the drop ceilings and door sweeps to the bottom of the study room doors.  Over Spring Break 2022 we added 90 degree boots at the return air ducts in the drop down ceilings and sound absorbing acoustical tiles to the walls.  

Before Photos - Singles

Single study room.

Before pictures of the single study rooms upstairs.

Single study room.

Before photo.

Single study room.

Before photo.

Single study room.

How it used to be!

In-Progress Photos - Singles

Single study room in progress.

In progress pictures of the single study rooms.

Single study room in progress.

Painting the walls.

Single study room in progress.

Almost done!

Single study room in progress.

The walls completely painted grey.

After Photos - Singles

Single study room after photo.

The new panels.

Single study room done.

An after photo.

Single study room done.

Work completed! New single study room.

Before Photos - Doubles

Before pictures of the doubles study rooms 223-226 upstairs.

Double study rooms.

Before photo.

Double study rooms.

A picture of outside the rooms.

In-Progress Photos - Doubles

In progress pictures, the new color of the walls.

Changing the carpet.

In progress photo.

After Photos - Doubles

Double study rooms done.